In 2019, the repair of the facades and restoration of the   were certified. The Old Hop Certification Centre in
          windows of house No. 61 on Hošťálkovo Square and the   Tyršova Street with its high baroque period structures
          restoration of the street facade of No. 24 in Dvořákova   has been preserved, the most valuable of these being
          Street were completed. The roof covering of the burgher   its roof structure. After the great advancement in hop
          house No. 31 in Dvořákova Street and No. 136 in   processing,  the  certification  institute was replaced  by
          Hošťálkovo Square was replaced. The unique restoration   the New Hop Certification Centre in house No. 1612.
          of the plaster and painting decoration of the burgher   The building is in a  stabilised technical condition, the
          house was carried out in No. 108 on 5. května Square.   same as the neighbouring building, the vast premises
          Repair of the roof structure and replacement of the roof   in Chmelařské Square. Both buildings are examples of
          covering on No. 346 and restoration of the facades and   authentic structures, they are in good condition, and
          roof of the house No. 1339 on Chmelařské Square took   their maintenance is carried out continuously.
          place. In 2019, the remodelling and new stone pavmentof
          Nerudy Square in the Urban Heritage Zone was completed.  The Town Hall
          Repairs in recent years have also affected some buildings   The historic town hall on Svobody Square is still used
          that have a unique position in the town, and are therefore   as the main building of the municipal government. Also,
          listed in more detail:                            for this reason, the building is maintained in a condition
                                                            corresponding to its necessary representational nature.
         The Burgher Brewery No. 81                         In 2016, the documentation for the overall rehabilitation
         The extensive premises of the Žatec Brewery are in private   of the town hall facade and parts of the interior spaces
          ownership. Since the 1990s, the ownership has changed   (sanitary facilities and an elevator) was completed.
          with the aim of maintaining the brewery’s  function,   The town of Žatec received a  subsidy for this renewal
          which is connected with the Žatec hop growing tradition.   from  the  Integrated  Regional  Operational  Programme
          Currently, restorations are underway, targeting the   (IROP). Restoration work began in the autumn of 2018.
          aesthetically unsuitable changes of some of the facades   Completion is planned for the second half of 2020.
                                                 nd
          which were done during the course of the 2  half of
          the 20  century. In 2015, construction modifications   Meder’s house
               th
          were carried out along with the restoration of the   At the end of 2018, an extensive restoration of a  great
          brewery’s principal facade, including the restoration of   burgher house from the turn of the 14  and 15  centuries
                                                                                                  th
                                                                                           th
          missing elements of the architectural decorations. Some   began. The use of the premises and the presentation
          windows were replaced by new, wooden ones, and a two-  of the highly historically valuable building will focus   227
          leaf wooden entrance door was hung in the door frame.  on the general public, and the aim is to present the
         The restoration also included the painted advertising   construction and development phases of the house and
          signs in a historical style on the facade of the building.  to introduce Maria Treben, an important native of Žatec.
                                                            The restoration is being carried out by the Meder House
          In 2016, the interior courtyard was restored, and building   Association, which received a subsidy from the Integrated
          repairs were made to the brewery’s  interior facades.   Regional Operational Programme (IROP). The restoration
          In the same year, a  new cultural heritage asset was   is expected to be completed in 2020.
          declared, a  Renaissance water tower, and a  viewpoint
          available to the public. The project was supported by the   The Municipal Library No. 52
          in accordance with the "Programme for the Conservation   Restoration  work on  the late  Gothic burgher house
          and Restoration of Cultural Heritage of the Ústecký Region   began at the end of 2017, with the contribution of the
          for 2016". At the same time, the project was implemented   subsidy programme from the Ministry of Regional
          using a financial contribution provided by the Ministry of   Development and the European Regional Development
          Culture under the "Programme for the Regeneration of   Fund of the European Union. Commissioning took place
          Urban Heritage Reserves and Urban Heritage Zones."  in September 2018. Repairs of roof structure and ceiling
                                                            beams  attacked  by  woodworm,  reinforcement  of  the
          In 2017, the Žatec Brewery began preparing the    ceiling structure, new roofing, replacement of windows,
          restoration of the declared cultural heritage asset   restoration of the facade, and other parts of the interior
          building  No.  85  within  the  brewery  complex.  As  part   of the building, including restoration of the internal
          of the project, supported by the Integrated Regional   plaster and repair of space on the town walls and its
          Operational Programme (IROP), the building was    access took place.
          revitalised, the practical use of the historical asset was
          regenerated, and the exhibition of the History of Brewing   The Church of the Assumption of the Virgin Mary
          in the Žatec Region was built. The restoration started at   The most important preserved religious building of
          the end of 2018 and was completed in mid-2020.    the town is the Dean’s  Church of the Assumption of
                                                            the Virgin Mary that is inseparably bound with the
         The Hop Certification Centres                      spiritual life of Žatec. It also plays an irreplaceable role
          Among the functionally significant buildings connected   in its skyline. The church is in a good constructional-
          with  hops  are  the  premises  where  the  hops’  origins   technical condition.