149, 150, and 151 on the main Svobody square. The street 119 on Svobody Square was done. Further work on
facades on burgher house No. 152 in Dlouhá Street and the repair of the roof, facade, and porch on the north
4. State of Conservation and factors affecting the Property
No. 154 in Jiráskova Street were also repaired, including side of house No. 209 on Chelčického Square was
the courtyard facade and the repair of the historical wall completed. Also noteworthy was the replacement of
in the courtyard. Equally important was the restoration of the roofing on the hop warehouse No. 531 and the
the facade of the former hop warehouse No. 348/2. repair of the roof at the hop warehouse No. 483/3 on
Prokopa Velkého the Square.
In house No. 96 in Josefa Hory Street, the facade was
repaired, including the addition of shambranos around The restoration of the porch of the extension of house
the windows, the construction of a ledge, and the No. 108 on the 5. května Square was also carried
connection of the stone statue with the bay window. out, as well as the replacement of the shop windows
Further repairs were made to the facade of the house No. of houses Nos. 167 and 244 on Obránců míru Street.
948 in Masarykova street. Further work on the renewal of the roof, windows and
gates and the brewery chimney at No. 303 on Prokopa
In this year, the town of Žatec carried out the first part of Velkého Square, restoration of the facade of No. 359 at
the installation of a new graphically unified identification Nákladní Street was carried out.
of houses and streets in the Urban Heritage Reserve, in
the form of house number plates. The graphic design was The renowal of the historic paving in the Urban Heritage
chosen to match the hop tradition. Reserve in Josefa Hory Street and Oblouková Street
was completed, the historic paving of U Plynárny
In 2018, within the frame of the component part Street was carried out, and the surfaces in the natural
02, the facade of house No. 49 Libočanská Gate pavement in Nákladní Street and Karla IV Street were
was also repaired and a complete revitalisation of restored. In 2018, the renowal of Nerudovo Square
the Municipal Library at house No. 52 on Svobody in the Urban Heritage Zone was started. In 2018, the
Square was carried out. Restoration of the courtyard town of Žatec completed the installation of a new
facade of the house, refurbishment, and partial graphically unified identification of houses and streets
replacement of windows and entrance doors of No. in the Urban Heritage Reserve.