Page 219 - UNESCO_Zatec_2021_A4
P. 219
Southeast view from the chateau chapel of the hop fields, Stekník, 2019
The territory of component part 01 is well preserved in Consul Gerold Déteindre. The new main tour includes the
terms of the state of conservation of its main properties. ground floor salaterren, the entrance hall, and corridor
During the last ten years, there have been no development of the south wing, the main hall, the four rooms of the
activities, except for ongoing repairs to several buildings west wing, and the chateau chapel. However, visitors
and two overall modernizations. are allowed to visit the still unrestored areas of the
south wing. This sightseeing tour offers views of a fresco
In 2012, a minor repair of the facade No. 21 was carried painting from the 18 century presented in the form of 219
th
out. In 2014, the roof was replaced at No. 23 and the restoration probes.
facade at the former brewery No. 29 was repaired.
The need to develop adequate access and parking is
In 2015, a complete renovation of the houses No. 12 and related to the ongoing and expected increase in traffic.
No. 17 took place. For house No. 23, a complete repair of The next stage of the restoration of the terrace gardens
the facade to the street was carried out. is planned, including the chateau courtyard and the
restoration of the surviving external plasters of the
In 2019, the roof structure of No. 26 was repaired. chateau (see Management Plan).
Major construction and restoration work has been carried
out continuously at the Stekník Chateau since 1997. In the
first phase, emergencies were removed: the roofing and
bearing roof structure, electrical installation, and partial
garden terraces were restored. A hydrogeological well
was drilled (until 2014, the village of Stekník was without
a backbone water supply system). Since 2014, interior
repairs have also been carried out. In the first stage of
the restoration financed by the Ministry of Culture, the
chateau Chapel of the Visitation of the Virgin Mary, with
the original furniture from 1772, was completely restored.
This was followed by the restoration of the entrance hall
and corridor with rich stucco decoration, and facilities for
visitors were built.
In the period 2016-2019, the II. stage of interior
restoration was carried out, again funded by the Ministry
of Culture. The aim was to create a tour route, presenting
the chateau at the time of the last private owner, in the
interwar period of the 20 century, the family of Swiss
th
Historical hop drying kiln in the locality of the former sheep farm, Stekník, 2019

